Concrite – Kirrawee
Concrite
5.9 km · $60–90 indicative fee
.jpg&w=3840&q=60)
Check live ready-mix prices and availability for your Barden Ridge address, see the delivered cost upfront, and book online.
Enter the delivery address in 2234 to check live plant availability.
Published Sydney material pricing for N25 concrete is $340–370/m³ before delivery, short-load charges, pump hire, waiting time, surcharges, and GST. The closest listed plant to Barden Ridge is in the close (within ~10 km) band.
Indicative planning total
$1,760–1,940
N25, 5 m³, before GST using the closest listed delivery band. This is not a bookable quote.
Availability, price and delivery fees are priced to your exact Barden Ridge address
Live plant availability. Instant Book slots confirm on the spot.
Move the date or add a load from your order. We sort it with the plant.
Current timing comes from the live quote, not a suburb-wide promise. Have the address, date, grade, volume, truck access, placement method and crew plan ready before you compare options.
Address + date
These determine the supply options shown in the live search
Grade + volume
Confirm the specified mix and measured order quantity
Access + placement
Match the truck, chute or pump plan to the site
Recorded batching locations for Barden Ridge are at Kirrawee and Miranda to the east, with Caringbah further away. Straight-line distance does not reflect the road route or supply; the live 2234 address quote does.

| Plant | Straight-line distance | Zone | Est. fee |
|---|---|---|---|
| Concrite – KirraweeConcrite | 5.9 km | Close (within ~10 km) | $60–90 |
| Central Concrete – MirandaCentral Concrete | 8.8 km | Close (within ~10 km) | $60–90 |
| Heidelberg Materials (Hanson) – CaringbahHeidelberg Materials | 10.3 km | Standard (~10–15 km) | $90–130 |
| Boral Concrete – Taren PointBoral | 10.4 km | Standard (~10–15 km) | $90–130 |
| Holcim – CaringbahHolcim | 10.9 km | Standard (~10–15 km) | $90–130 |
Concrite
5.9 km · $60–90 indicative fee
Central Concrete
8.8 km · $60–90 indicative fee
Heidelberg Materials
10.3 km · $90–130 indicative fee
Boral
10.4 km · $90–130 indicative fee
Holcim
10.9 km · $90–130 indicative fee
Compare against the 5 m³ scale
The 2021 Census counts 91.8% of occupied Barden Ridge dwellings as separate houses. Get Council's levels and approval before forming the driveway.
Compare against the 12 m³ scale
Four or more bedrooms describe 80.8% of Barden Ridge dwellings. Large outdoor slabs often need staged pours and a line pump.
Compare against the 5 m³ scale
Council considers a second driveway only where the frontage exceeds 20 metres and crossings are over 6 metres apart, and checks the front landscaping ratio.
Barden Ridge crossings require Sutherland Shire Council consent and an Authorised Driveway Contractor. A second driveway also has to meet Council's landscaping ratio for the front setback. A pump on the road or footpath needs Council approval.
With no apartments recorded, small Barden Ridge pours are steps, paths and pads around houses. Confirm the barrow route before choosing a small load. Four in five Barden Ridge homes have four or more bedrooms, and small pours often sit in the backyard. Measure the gate width, steps and any fall from the kerb. Where barrows are impractical, plan a line pump and allow time for Council approval if it stands on the road.
| Job | Volume | Typical grade |
|---|---|---|
| Shed slab / equipment pad | 1-2 m3 | N20-N25 |
| Driveway repair / patch | 0.5-1 m3 | N25 |
| Post holes / fence footings | 0.3-0.8 m3 | N20 |
| Garden path / edging | 0.5-1.5 m3 | N20 |
N25 and N32 cover many residential pours, but structural work must follow the engineer's specification. Published material bands below exclude delivery, other charges and GST.
1.6 km away · delivery and pour planning
1.9 km away · delivery and pour planning
2.7 km away · delivery and pour planning
Sutherland Shire Concrete Delivery
Enter your delivery address and date to check current pricing for Barden Ridge.