Check live ready-mix prices and availability for your Bangor address, see the delivered cost upfront, and book online.
Enter the delivery address in 2234 to check live plant availability.
Published Sydney material pricing for N25 concrete is $340–370/m³ before delivery, short-load charges, pump hire, waiting time, surcharges, and GST. The closest listed plant to Bangor is in the close (within ~10 km) band.
Indicative planning total
$1,760–1,940
N25, 5 m³, before GST using the closest listed delivery band. This is not a bookable quote.
Availability, price and delivery fees are priced to your exact Bangor address
Live plant availability. Instant Book slots confirm on the spot.
Move the date or add a load from your order. We sort it with the plant.
Current timing comes from the live quote, not a suburb-wide promise. Have the address, date, grade, volume, truck access, placement method and crew plan ready before you compare options.
Address + date
These determine the supply options shown in the live search
Grade + volume
Confirm the specified mix and measured order quantity
Access + placement
Match the truck, chute or pump plan to the site
Recorded batching locations for Bangor are at Kirrawee and Miranda, with Caringbah further east. Straight-line distance does not show route, capacity or which plant can serve your date; the live 2234 quote confirms.

| Plant | Straight-line distance | Zone | Est. fee |
|---|---|---|---|
| Concrite – KirraweeConcrite | 4 km | Close (within ~10 km) | $60–90 |
| Central Concrete – MirandaCentral Concrete | 6.7 km | Close (within ~10 km) | $60–90 |
| Heidelberg Materials (Hanson) – CaringbahHeidelberg Materials | 8.2 km | Close (within ~10 km) | $60–90 |
| Boral Concrete – Taren PointBoral | 8.3 km | Close (within ~10 km) | $60–90 |
| Holcim – CaringbahHolcim | 8.8 km | Close (within ~10 km) | $60–90 |
Concrite
4 km · $60–90 indicative fee
Central Concrete
6.7 km · $60–90 indicative fee
Heidelberg Materials
8.2 km · $60–90 indicative fee
Boral
8.3 km · $60–90 indicative fee
Holcim
8.8 km · $60–90 indicative fee
Compare against the 5 m³ scale
Separate houses are 88.6% of occupied Bangor dwellings. The usual first step is Council's driveway application, which takes about three to four weeks.
Between the 2 m³ and 5 m³ scales
Townhouses and semi-detached homes are 9.2% of Bangor's stock. Use Council's multiple-dwelling driveway application where a crossing serves more than one home.
Compare against the 12 m³ scale
About two-thirds of Bangor dwellings (65.5%) have four or more bedrooms. Plan pump access and pour stages from the engineered drawings.
For Bangor driveways, Sutherland Shire Council consent and boundary levels come first, and only authorised contractors may work in the road reserve. A pump standing on a Bangor street needs Council approval; lodge at least five days ahead to avoid the urgency fee.
Bangor has few apartments (2.4%), so small pours are paths, pads and repairs around houses and townhouses. Check the barrow route from the kerb. About two-thirds of Bangor homes have four or more bedrooms, so many small pours sit in rear yards. Measure gate widths and steps on the barrow route, and where a crossing serves several townhouses, agree with neighbours where the truck can stand without blocking access.
| Job | Volume | Typical grade |
|---|---|---|
| Shed slab / equipment pad | 1-2 m3 | N20-N25 |
| Driveway repair / patch | 0.5-1 m3 | N25 |
| Post holes / fence footings | 0.3-0.8 m3 | N20 |
| Garden path / edging | 0.5-1.5 m3 | N20 |
N25 and N32 cover many residential pours, but structural work must follow the engineer's specification. Published material bands below exclude delivery, other charges and GST.
Enter your delivery address and date to check current pricing for Bangor.