Concrete Calculator for Australian Pours

Calculate concrete volume in m³, 20kg bags, waste allowance and indicative pour cost for Australian slabs, driveways, footings and DIY or trade jobs.

Pour plan

Start with your project

Pick the closest match. We’ll show only the measurements and advice that matter for that pour.

Common pours

Tap one to continue
More shapes & specialist poursCrossover, stairs, kerbs and round work
ShotcreteSprayed concrete needs a specialist assessmentSpecialist advice
Structural concreteEngineered pours need approved plansSpecialist advice

Measure once, order sensibly

How the volume estimate works

The calculator converts every input to metres, applies the correct geometry for your project, adds your chosen waste allowance, then rounds the recommended order to the next 0.2m³. It keeps indicative planning costs separate from live supplier quotes.

Worked example

A 5m × 4m slab at 100mm deep. Convert the depth to metres first: 100mm ÷ 1000 = 0.1m.

Volume
5 × 4 × 0.1 = 2.00 m³
Plus 10% waste
2.20 m³
Order this much
2.20 m³
Or in 20kg bags
238 bags

Ready-mix is ordered in 0.2m³ steps, so the recommended order rounds up to the next step.

Concrete volume formulas

These are the formulas the calculator uses. Convert every measurement to metres before multiplying.

Concrete volume formula by project type
ProjectFormula
Slabs, driveways, paths, patios, crossovers, kerbslength (m) × width (m) × depth (m)
Strip footingslength (m) × width (m) × depth (m)
Round piers or post holesπ × (diameter ÷ 2)² × depth (m) × number of holes
Square pierswidth (m)² × depth (m) × number of piers
Round pours and columnsπ × (diameter ÷ 2)² × depth (m)
Stairswidth (m) × tread (m) × riser (m) × (steps × (steps + 1) ÷ 2)
Pool surrounds and other subtractive areas(total area − pool area) (m²) × depth (m)

Common Australian pours

Typical jobs with 10% waste added and the 20kg bag equivalent. These are planning references, not recommended structural dimensions — confirm depth, strength and reinforcement with your concreter or engineer.

Common Australian concrete pours with volume, waste allowance and 20kg bag equivalent
ProjectDimensionsVolume+10% waste20kg bags
Single garage slab6m × 3m × 100mm1.80 m³1.98 m³214
Double driveway12m × 3m × 100mm3.60 m³3.96 m³428
Patio4m × 4m × 100mm1.60 m³1.76 m³191
Garden path10m × 1m × 75mm0.75 m³0.83 m³90
Fence post holes10 holes, 300mm dia × 600mm0.42 m³0.47 m³51

Why you order more than you measure

Concrete is lost to spillage, uneven formwork and over-excavation, and running short mid-pour is far more expensive than a little spare. The waste allowance is a planning assumption, not a measurement:

  • 5% — precise formwork, experienced crew, flat prepared base.
  • 10% — the usual allowance for residential work.
  • 15% — irregular shapes, rough excavation, or a first DIY pour.

Bags or ready-mix?

One cubic metre is roughly 108 × 20kg bags, which is a lot of mixing. Bagged concrete suits small pours under about 0.5m³ — post holes, a small landing, a repair. Beyond that, ready-mix is cheaper per cubic metre and dramatically faster.

Small loads usually attract a short-load fee because the truck and driver cost the same regardless of how full it is.

Frequently Asked Questions

How do I calculate concrete volume?
Multiply length × width × depth with every measurement converted to metres. The MixHub calculator handles the unit conversion and project-specific formulas for you.
How much extra concrete should I order?
Ten percent is a common waste allowance for residential work. Precise formwork may need less; irregular excavation and difficult access may need more.
How many 20kg bags of concrete make one cubic metre?
About 108 bags of 20kg pre-mixed concrete make one cubic metre. Bags suit pours under roughly 0.5m³; past that, ready-mix is cheaper per cubic metre and far quicker than mixing by hand.
What is a short-load surcharge?
Suppliers usually add a fee to small deliveries because the truck and driver cost the same whether it is full or carrying half a metre. It is worth checking whether rounding up to a fuller load actually costs much more.
Can I find my project using an address?
Yes. Choose Locate on map, search an Australian address, and the calculator opens a close top-down satellite view at zoom level 20.
Are the cost estimates live supplier prices?
No. The instant estimate uses typical Sydney market ranges for planning. Use Get live quotes for current supplier availability and delivered prices near your postcode.
Which concrete strength should I choose?
The calculator shows a common starting point by project type. Always confirm strength, reinforcement and finish with your concreter or engineer before ordering.