Concrite – Kirrawee
Concrite
1.2 km · $60–90 indicative fee
.jpg&w=3840&q=60)
Check live ready-mix prices and availability for your Gymea address, see the delivered cost upfront, and book online.
Enter the delivery address in 2227 to check live plant availability.
Published Sydney material pricing for N25 concrete is $340–370/m³ before delivery, short-load charges, pump hire, waiting time, surcharges, and GST. The closest listed plant to Gymea is in the close (within ~10 km) band.
Indicative planning total
$1,760–1,940
N25, 5 m³, before GST using the closest listed delivery band. This is not a bookable quote.
Availability, price and delivery fees are priced to your exact Gymea address
Live plant availability. Instant Book slots confirm on the spot.
Move the date or add a load from your order. We sort it with the plant.
Current timing comes from the live quote, not a suburb-wide promise. Have the address, date, grade, volume, truck access, placement method and crew plan ready before you compare options.
Address + date
These determine the supply options shown in the live search
Grade + volume
Confirm the specified mix and measured order quantity
Access + placement
Match the truck, chute or pump plan to the site
Recorded batching locations close to Gymea sit at Kirrawee and Miranda, with Caringbah a little further. Straight-line distance does not show which plant can serve your address or date; the live 2227 quote does.

| Plant | Straight-line distance | Zone | Est. fee |
|---|---|---|---|
| Concrite – KirraweeConcrite | 1.2 km | Close (within ~10 km) | $60–90 |
| Central Concrete – MirandaCentral Concrete | 2.2 km | Close (within ~10 km) | $60–90 |
| Heidelberg Materials (Hanson) – CaringbahHeidelberg Materials | 3.5 km | Close (within ~10 km) | $60–90 |
| Boral Concrete – Taren PointBoral | 3.6 km | Close (within ~10 km) | $60–90 |
| Holcim – CaringbahHolcim | 4.1 km | Close (within ~10 km) | $60–90 |
Concrite
1.2 km · $60–90 indicative fee
Central Concrete
2.2 km · $60–90 indicative fee
Heidelberg Materials
3.5 km · $60–90 indicative fee
Boral
3.6 km · $60–90 indicative fee
Holcim
4.1 km · $60–90 indicative fee
Between the 2 m³ and 5 m³ scales
Flats and apartments are 31.5% of occupied Gymea dwellings in the 2021 Census. Building access hours, common-property approval and hose routing usually matter more than the slab footprint.
Compare against the 5 m³ scale
Townhouses and semi-detached homes are 22.8% of Gymea's stock. A change to a shared crossing still needs Council consent and new boundary levels from Council's inspectors.
Compare against the 12 m³ scale
Separate houses are 44.7% of Gymea dwellings, fewer than in most surrounding suburbs. Expect neighbouring density to limit kerb space, and confirm truck standing room before the pour.
Gymea jobs that put a pump or crane on the road or footpath need Sutherland Shire Council approval, with an urgency fee inside five days of the work. Where a complex needs repeated deliveries, a Council work zone covers loading and unloading on the roadway. Driveway crossings need Council consent and an authorised contractor.
Gymea's mix of apartments and townhouses means small jobs often happen inside complexes with tight access. Check the barrow or pump route through common areas, and get Council approval if anything stands on the footpath. In a Gymea complex, agree with the owners corporation where the truck will stand without blocking residents. If repeated deliveries need the roadway, ask Council about a work zone before the first pour.
| Job | Volume | Typical grade |
|---|---|---|
| Shed slab / equipment pad | 1-2 m3 | N20-N25 |
| Driveway repair / patch | 0.5-1 m3 | N25 |
| Post holes / fence footings | 0.3-0.8 m3 | N20 |
| Garden path / edging | 0.5-1.5 m3 | N20 |
N25 and N32 cover many residential pours, but structural work must follow the engineer's specification. Published material bands below exclude delivery, other charges and GST.
Enter your delivery address and date to check current pricing for Gymea.