Concrete for a Shed Slab in Sydney
Order shed-slab concrete from the slab dimensions and specified thickness, then account for beams, footings and an agreed allowance. Compare bags with delivery using the total quantity, required mix and access from the truck to the shed site.
Start with the slab details, not just the shed label
A shed sold as 3 × 3 m does not automatically need a slab exactly that size. Check the slab drawing for external dimensions, rebates, thickened edges, anchor positions and separate footings before measuring concrete.
For example, Absco’s garden-shed guidance describes a particular 3 × 2.26 m model with a 100 mm slab and a 25 mm deep, 75 mm wide rebate. Those details belong to that model; use the drawing supplied for your own shed.
| Input | What to record | Where it comes from |
|---|---|---|
| Slab footprint | Actual concrete length and width in metres | Slab drawing, checked against formed dimensions |
| Thickness | Your specified thickness in millimetres | Manufacturer’s details or engineer’s design, supplied by you to the calculator |
| Extra concrete | Beam, pad and pier dimensions; any rebates | Project footing and edge details |
| Mix specification | Grade, aggregate size, slump and any required additions | Project specification, confirmed with the concreter and supplier |
Thickness and grade do different jobs. A stronger mix does not establish that a thinner slab, different mesh or smaller footing will suit the shed. If the shed will hold a vehicle, machinery or a hoist, have those loads included in the design before requesting concrete.
Concrete volume for common shed footprints
Volume = length × width × thickness in metres. Divide millimetres by 1,000 first: 125 mm becomes 0.125 m. The table is calculated from this formula, with volumes rounded to three decimal places.
The thickness columns are examples, not recommendations. Use a column only if it matches the thickness supplied for your project. These are flat-slab quantities before beams, footings, rebates or allowance.
| Concrete footprint | Area (m²) | 100 mm (m³) | 125 mm (m³) | 150 mm (m³) | Use these dimensions |
|---|---|---|---|---|---|
| 2.25 × 1.5 m | 3.375 | 0.338 | 0.422 | 0.506 | Calculate 2.25 × 1.5 m |
| 3 × 2.25 m | 6.75 | 0.675 | 0.844 | 1.013 | Calculate 3 × 2.25 m |
| 3 × 3 m | 9 | 0.900 | 1.125 | 1.350 | Calculate 3 × 3 m |
| 3 × 4.5 m | 13.5 | 1.350 | 1.688 | 2.025 | Calculate 3 × 4.5 m |
| 3 × 6 m | 18 | 1.800 | 2.250 | 2.700 | Calculate 3 × 6 m |
| 6 × 6 m | 36 | 3.600 | 4.500 | 5.400 | Calculate 6 × 6 m |
Each link fills the footprint into the calculator’s size step. Replace its default depth with your specified thickness and review the allowance and mix settings before using the estimate. A size preset does not select an approved shed design.
Turn the slab volume into an order quantity
- Confirm the actual slab dimensions and specified thickness.
- Calculate the flat slab using length × width × thickness.
- Add the additional volume of beams, pads or piers. Count only the part outside the volume already measured.
- Account for rebates or other detailed geometry with your concreter.
- Agree an allowance for the measured site, then confirm the supplier’s order increments and minimum quantity.
A percentage allowance cannot replace measured footings. For a 3 × 6 m slab, an extra 10 mm of depth across the whole footprint uses another 0.18 m³ (3 × 6 × 0.01), which is why checking the prepared base matters before booking.
Worked example: a 3 × 3 m garden-shed slab in Blacktown
Suppose your supplied details call for a 3 × 3 m flat slab at 100 mm, with no additional beam or footing volume in this example. Your concreter agrees to a 10% allowance for estimating.
| Calculation | Quantity |
|---|---|
| 3 × 3 × 0.100 | 0.900 m³ flat slab |
| 0.900 × 10% | 0.090 m³ example allowance |
| 0.900 + 0.090 | 0.990 m³ estimated requirement |
| Quantity to discuss with supplier | 1.0 m³, subject to available increments and site confirmation |
Open this 3 × 3 m calculation and change it to your dimensions. The 10% allowance is an example, not a universal order rule; a designed edge beam would need its own quantity added first.
Should you mix bags or order delivery?
Choose bags only when you can mix, move and place the complete quantity with the required product and crew. Otherwise, arrange delivery with an agreed discharge method. A narrow side gate alone does not settle the decision: delivered concrete may still reach the slab by wheelbarrow or pump.
As a product-specific example, Cement Australia’s Concrete Mix data sheet specifies 110 × 20 kg bags per cubic metre. Check the current packaging for the product you buy; bag yields vary, and bags of cement are not bags of complete concrete mix.
| Example at supplied 100 mm depth | Flat volume | 20 kg bags, rounded up | Dry bag weight |
|---|---|---|---|
| 2.25 × 1.5 m | 0.3375 m³ | 38 | 760 kg |
| 3 × 3 m | 0.9 m³ | 99 | 1,980 kg |
| 3 × 6 m | 1.8 m³ | 198 | 3,960 kg |
For the Blacktown example, 0.99 m³ would require 109 bags at that yield, rounded up. That is 2,180 kg of dry product to source and handle, plus water, mixing equipment and the work of placing and finishing.
| Your situation | Practical decision | Confirm first |
|---|---|---|
| Small quantity and a workable mixing plan | Bags may suit | Product specification, bag yield, mixer output and enough help to complete the pour |
| Dozens of batches or limited mixing help | Compare a delivered small load | Total delivered price and crew ready to place and finish it |
| Truck can reach a suitable discharge point | Ask about direct chute delivery | Supplier-approved access and actual chute reach |
| Backyard pour beyond chute reach | Plan wheelbarrows or a pump with the concreter | Route, distance, crew, discharge time and pump-compatible mix if needed |
| Chosen bag does not meet the specified mix | Source a suitable product or specified ready-mix | Written product details against the project requirements |
Access questions before booking shed concrete
A 0.99 m³ order for a backyard shed in Marrickville needs a different placement plan from the same quantity beside an open driveway in Blacktown. Send measurements and photos of the actual route; the suburb and load size cannot establish whether a truck will fit.
| Question to answer | Information to give the supplier or concreter |
|---|---|
| Where can the truck stop and discharge? | Street or driveway location, parking restrictions and distance to the shed slab |
| What is the narrowest and lowest point? | Clear gate and driveway widths, eaves, branches, overhead services and turning space |
| Can the route support the loaded truck? | Driveway and ground condition, slopes, buried services, covers and nearby excavations |
| How will concrete reach the formwork? | Chute position or measured wheelbarrow/hose route, including steps and tight corners |
| Who is moving and finishing it? | Crew size, equipment, planned discharge time and arrangements if the truck cannot enter |
| Where will washout happen? | Agreed contained area and arrangements to protect drains and neighbouring property |
Boral’s delivery requirements include a minimum 3 m clear access-road width. That is one supplier requirement, not a guarantee of access: confirm the actual vehicle, height, turning, ground support and discharge position with the supplier serving your order.
Get a price for the concrete you actually need
Once the quantity and access plan are clear, compare the complete supply options. For bags, multiply the rounded-up bag count by your current bag price and add transport and equipment; for delivery, request the price for your address, quantity, specified mix and date.
If the Blacktown example’s specification calls for N25 and you order 1.0 m³, MixHub’s published Sydney material range gives an indicative material component of $340–370. This excludes delivery, short-load charges, service fee, pumping, waiting time and GST; it is not a delivered quote or an installed shed-slab price.
Ask what the quote includes, the minimum billed quantity, allowed discharge time and any access-related truck charge. Keep excavation, formwork, reinforcement, placing and finishing in the concreter’s scope so a concrete-supply price is not mistaken for the whole shed base.
Calculate your order using your slab details, then check Sydney small-load pricing and delivery options. Have the specified mix and access answers ready before you book.
Frequently Asked Questions
How much concrete do I need for a 3 × 3 m shed slab?
Is 100 mm thick enough for my shed slab?
What concrete grade should I order for a shed?
How many bags would a 3 × 3 m slab need?
Can a concrete truck deliver to a backyard shed?
Does the calculator include my shed footings?
Ready to order concrete in Sydney?